Flexity Outlook, Bogie Overhaul

Vendeur : Alstom Siegen (Ref: Bogie_Overhaul_Outlook)
Fabricant : Alstom (Ref: Bogie_Overhaul_Outlook)
Sur demande

Flexity Outlook Bogie: Overhaul

Our proposal covers the following items

- Cleaning of bogie
- Disassem ...

Voir plus

Description

Descriptif techniques

Informations logistiques

A propos du vendeur

Flexity Outlook Bogie: Overhaul

Our proposal covers the following items

- Cleaning of bogie
- Disassembling and reassembling of bogie for overhaul to subsystems (piping and cabling remain on the frame)
- Paint spot repair
- Replacing primary springs
- Measuring secondary spring characteristics, re-newing corrosion protection
- Replacing dampers
- Replacing rubber/metal-parts
- Overhaul of roller bearings (inspection, re-greasing)
- Replacing center-pivot bush
- Replacing traction rod
- Visually checking pipework, hoses and cabling; repair where necessary
- Cleaning and checking earthing device, replacing wear parts
- Overhaul of magnetic track brake
- Overhaul of friction brake
- Motor: exchanging bearings, cleaning and checking of rotor and strator
- Gearbox: checking toothing
- Exchanging wear parts of wheel flange lubrication

Optional:
- Removing of painting (shot blasting) and re-painting the frame
- Magnetic particle testing (check for cracks)
- Exchanging or reprofiling wheel tyres
- Refurbishment of axle bearing housings

Others
- Final quality documentation, 3.1 certificate
- Mobilisation time: 16 weeks
- Lead time: 15 to 20 working days for 4 bogies
- Standard 12 months from the reception of the bogies by the customer
- FCA ALSTOM Siegen

Disponibilité du stock

On Demand

Incoterm

FCA

Alstom Siegen

Voir tous les produits

Description
+
-

Flexity Outlook Bogie: Overhaul Our proposal covers the following items - Cleaning of bogie - Disassembling and reassembling of bogie for overhaul to subsystems (piping and cabling remain on the frame) - Paint spot repair - Replacing primary springs - Measuring secondary spring characteristics, re-newing corrosion protection - Replacing dampers - Replacing rubber/metal-parts - Overhaul of roller bearings (inspection, re-greasing) - Replacing center-pivot bush - Replacing traction rod - Visually checking pipework, hoses and cabling; repair where necessary - Cleaning and checking earthing device, replacing wear parts - Overhaul of magnetic track brake - Overhaul of friction brake - Motor: exchanging bearings, cleaning and checking of rotor and strator - Gearbox: checking toothing - Exchanging wear parts of wheel flange lubrication Optional: - Removing of painting (shot blasting) and re-painting the frame - Magnetic particle testing (check for cracks) - Exchanging or reprofiling wheel tyres - Refurbishment of axle bearing housings Others - Final quality documentation, 3.1 certificate - Mobilisation time: 16 weeks - Lead time: 15 to 20 working days for 4 bogies - Standard 12 months from the reception of the bogies by the customer - FCA ALSTOM Siegen

Descriptif techniques
+
-

Informations logistiques
+
-

Disponibilité du stock

On Demand

Incoterm

FCA

A propos du vendeur
+
-

Alstom Siegen

Voir tous les produits