22CB005A1-101/110/S800 MAIN OVERHAUL
The technical revision includes:
1. Visual inspection of the equipment
2. Cleaning the equipment
3. A seria ...
Description
Technical details
Logistical Information
About vendor
The technical revision includes:
1. Visual inspection of the equipment
2. Cleaning the equipment
3. A serial test of the equipment
4. Replacement of flexible tubes
5. The replacement of the (obsolete) pressure regulator will require the replacement of some copper pipes for polymer pipes (Rilsan).
6. Replacement of seals (O-rings, base plate, piston)
7. Replacement of pneumatic components (filter, regulator, pressure switch, EVD, valve disc)
8. Replacing MV33-type EVDs. Replacing of auxiliary contacts
9. Replacement of fittings (banjos, taps)
10. Replacing the compression springs and the shock absorber assembly
11. Upper insulator replacement (bulb)
12. Lower insulator replacement
13. Painting finishing
14. Screw replacement (systematic)
15. Adding a maneuver counter
16. Realization of the series tests (dielectric and functional) and the test report
17. Quality inspection before shipment
NOTE: FOR FURTHER DETAILS, PLEASE CONTACT US
Associated product 1
DTR0000081062
Stock availability
On Demand
Incoterm
FCA
Alstom Tarbes - ATSA
The Alstom’s site of Tarbes is a global centre of excellence for traction systems dedicated to high speed and very high speed trains, regional trains and electric locomotives. The site is also Alstom’s global centre of excellence for power modules and electrical equipment.
Description
+
-
The technical revision includes: 1. Visual inspection of the equipment 2. Cleaning the equipment 3. A serial test of the equipment 4. Replacement of flexible tubes 5. The replacement of the (obsolete) pressure regulator will require the replacement of some copper pipes for polymer pipes (Rilsan). 6. Replacement of seals (O-rings, base plate, piston) 7. Replacement of pneumatic components (filter, regulator, pressure switch, EVD, valve disc) 8. Replacing MV33-type EVDs. Replacing of auxiliary contacts 9. Replacement of fittings (banjos, taps) 10. Replacing the compression springs and the shock absorber assembly 11. Upper insulator replacement (bulb) 12. Lower insulator replacement 13. Painting finishing 14. Screw replacement (systematic) 15. Adding a maneuver counter 16. Realization of the series tests (dielectric and functional) and the test report 17. Quality inspection before shipment NOTE: FOR FURTHER DETAILS, PLEASE CONTACT US
Technical details
+
-
Associated product 1
DTR0000081062
Logistical Information
+
-
Stock availability
On Demand
Incoterm
FCA
About vendor
+
-
Alstom Tarbes - ATSA
The Alstom’s site of Tarbes is a global centre of excellence for traction systems dedicated to high speed and very high speed trains, regional trains and electric locomotives. The site is also Alstom’s global centre of excellence for power modules and electrical equipment.