Flexity 2, Bogie Overhaul
Flexity 2, Bogie Overhaul
Our proposal covers the following items
- Cleaning of bogie
- Disassembling a ...
Description
Descriptif techniques
Informations logistiques
A propos du vendeur
Flexity 2, Bogie Overhaul
Our proposal covers the following items
- Cleaning of bogie
- Disassembling and reassembling of bogie for overhaul to subsystems (piping and cabling remain on the frame)
- Paint spot repair
- Replacing primary and secondary springs
-Replacing dampers
- Replacing rubber/metal-parts
- Visually checking axles
- Overhaul of axle boxes and bearings (inspection, re-greasing)
- Replacing swing-arm connection
- Visually checking pipework, hoses and cabling; repair where necessary
- Cleaning and checking earthing device, replacing wear parts
- Overhaul of magnetic track brake
- Overhaul of friction brake
- Motor: exchanging bearings, cleaning and checking of rotor and strator
- Gearbox: checking toothing
- Exchanging wear parts of wheel flange lubrication
Optional:
- Removing of painting (shot blasting) and re-painting the frame
- Magnetic particle testing (check for cracks)
- Exchanging or reprofiling wheel tyres
- Overhaul of bolster
- Overhaul of anti-roll bar
- Replacing centre pin cover sleeve
Others
- Final quality documentation, 3.1 certificate
- Mobilisation time: 16 weeks
- Lead time: 15 to 20 working days for 4 bogies
- Standard 12 months from the reception of the bogies by the customer
- FCA ALSTOM Siegen
Disponibilité du stock
On Demand
Incoterm
FCA
Alstom Siegen
Description
+
-
Flexity 2, Bogie Overhaul Our proposal covers the following items - Cleaning of bogie - Disassembling and reassembling of bogie for overhaul to subsystems (piping and cabling remain on the frame) - Paint spot repair - Replacing primary and secondary springs -Replacing dampers - Replacing rubber/metal-parts - Visually checking axles - Overhaul of axle boxes and bearings (inspection, re-greasing) - Replacing swing-arm connection - Visually checking pipework, hoses and cabling; repair where necessary - Cleaning and checking earthing device, replacing wear parts - Overhaul of magnetic track brake - Overhaul of friction brake - Motor: exchanging bearings, cleaning and checking of rotor and strator - Gearbox: checking toothing - Exchanging wear parts of wheel flange lubrication Optional: - Removing of painting (shot blasting) and re-painting the frame - Magnetic particle testing (check for cracks) - Exchanging or reprofiling wheel tyres - Overhaul of bolster - Overhaul of anti-roll bar - Replacing centre pin cover sleeve Others - Final quality documentation, 3.1 certificate - Mobilisation time: 16 weeks - Lead time: 15 to 20 working days for 4 bogies - Standard 12 months from the reception of the bogies by the customer - FCA ALSTOM Siegen
Descriptif techniques
+
-
Informations logistiques
+
-
Disponibilité du stock
On Demand
Incoterm
FCA