Overhaul Mitrac Protect™ HSCB ARC 1520
Overhaul Mitrac Protect™ HSCB ARC 1520 includes:
Cleaning all ARC
A serial test of the equipment
Checki ...
Description
Descriptif techniques
Informations logistiques
A propos du vendeur
Overhaul Mitrac Protect™ HSCB ARC 1520 includes:
Cleaning all ARC
A serial test of the equipment
Checking the breaking chamber
Cleaning the breaking chamber
Replacing defective parts of chamber
Checking the blow horns (Replacing defective part)
Cleaning the blow horns (Replacing defective part)
Cleaning the sub-assy and components (Replacing defective parts)
Cleaning the power contacts
Replacing the main contacts
Lever/drawer clearance control
Drawer visual inspection (Replacing defective part)
Lever / electromagnet clearance control
Inspection of electromagnet (Replacing defective part)
Axis replacement (link between drawer / mobile lever)
Cleaning the contact surface of tripping lever
Braid / magnetic circuit / equipotential bonding check (Replacing defective parts)
Wiring visual inspection
Replacement of auxiliary contacts
Screw replacement (systematic)
Trigger threshold verification.
Series test after reassembly (dielectric and functional) and the test report
Quality inspection before shipment
Overhaul 900 000Km Citadis
NOTE: FOR FURTHER DETAILS, PLEASE CONTACT US
Produit associé 1
HSCB panel
Produit associé 2
ARC 1520
Longueur (mm)
490
Largeur (mm)
270
Hauteur (mm)
534
Durée de vie
250 000 cycles
Tension d'entrée (KV)
1500 Vdc
Disponibilité du stock
On Demand
Incoterm
FCA
Adresse de livraison FCA
50 Rue du Dr Guinier
Code Postal
65600
Ville
Séméac

Alstom Tarbes - ATSA
The Alstom’s site of Tarbes is a global centre of excellence for traction systems dedicated to high speed and very high speed trains, regional trains and electric locomotives. The site is also Alstom’s global centre of excellence for power modules and electrical equipment.
Description
+
-
Overhaul Mitrac Protect™ HSCB ARC 1520 includes: Cleaning all ARC A serial test of the equipment Checking the breaking chamber Cleaning the breaking chamber Replacing defective parts of chamber Checking the blow horns (Replacing defective part) Cleaning the blow horns (Replacing defective part) Cleaning the sub-assy and components (Replacing defective parts) Cleaning the power contacts Replacing the main contacts Lever/drawer clearance control Drawer visual inspection (Replacing defective part) Lever / electromagnet clearance control Inspection of electromagnet (Replacing defective part) Axis replacement (link between drawer / mobile lever) Cleaning the contact surface of tripping lever Braid / magnetic circuit / equipotential bonding check (Replacing defective parts) Wiring visual inspection Replacement of auxiliary contacts Screw replacement (systematic) Trigger threshold verification. Series test after reassembly (dielectric and functional) and the test report Quality inspection before shipment Overhaul 900 000Km Citadis NOTE: FOR FURTHER DETAILS, PLEASE CONTACT US
Descriptif techniques
+
-
Produit associé 1
HSCB panel
Produit associé 2
ARC 1520
Longueur (mm)
490
Largeur (mm)
270
Hauteur (mm)
534
Durée de vie
250 000 cycles
Tension d'entrée (KV)
1500 Vdc
Informations logistiques
+
-
Disponibilité du stock
On Demand
Incoterm
FCA
Adresse de livraison FCA
50 Rue du Dr Guinier
Code Postal
65600
Ville
Séméac
A propos du vendeur
+
-

Alstom Tarbes - ATSA
The Alstom’s site of Tarbes is a global centre of excellence for traction systems dedicated to high speed and very high speed trains, regional trains and electric locomotives. The site is also Alstom’s global centre of excellence for power modules and electrical equipment.